From quote to installed — one process.
Typical lead time is 4–8 weeks from signed quote to installed build. Simple standard-range orders can be quicker; larger bespoke builds may need longer.
- Step 01
Confirmation & survey
Once your quote is signed we book a site survey for larger builds.
- Step 02
Manufacture
Panels are CNC-cut, sealed, and finished in our UK workshop.
- Step 03
Delivery
Nationwide delivery on a booked slot with our own team.
- Step 04
Installation
On-site assembly, level check, and hygiene tray commissioning.
Site preparation
- Level base — concrete, paving or reinforced slab.
- Clear access route from the road to the install location.
- Nearby power for lighting or heating add-ons, if fitted.
Delivery notes
- UK mainland covered as standard.
- Highlands, islands and Northern Ireland by quote.
- Booked delivery windows — no all-day waits.
